This gym and leisure project required comprehensive, high-quality interior fit-out in central London.
The scheme combined technical complexity with premium finishes to meet the client’s expectations.
Our package of works included
- Installation of dry lining and partitioning systems
- Creating flexible layouts and acoustic separation
- Extensive suspended ceilings designed to conceal services and achieve a clean architectural finish.
- High specification bespoke joinery for the reception and communal spaces combining functionality and aesthetic quality.
- Durable ceramic wall and floor tiling to the wet areas and circulation spaces, ensuring long-term performance.
- Full M&E installations, which had to be seamlessly integrated into the fabric of the fit-out.
Project Challenges
- Project planning and scheduling: Integrating M&E systems with partitioning, ceilings, and joinery elements.
- Quality expectations: High specification requirements for finishes and bespoke joinery in line with the client’s premium service offer and target market in central London.
- Careful programme management: Sequencing multiple trades to deliver the scheme on time.
- Site constraints: Managing logistics and materials deliveries in a central London location with restricted access
Our Solution:
- We used specialist craftsmanship for the bespoke joinery to meet both design intent and client’s quality expectations.
- Robust quality control processes were implemented across tiling, joinery, and finishing works.
- Detailed logistics planning minimised disruption, with just-in-time deliveries and careful sequencing to suit the constraints of a central London site.










